# The cables will be 33mm in diameter, will be buried to an average depth of approximately 1.5 m and are expected to have an operational life of 35 years.

*web3 · news · 2026-05-08 · Independent.ie*

## Key points

- Amazon's Beaufort Cable System will replace a 1999 fibre optic cable that expired in 2024.
- The new cable will be buried 1.5 meters deep and have a 35-year operational lifespan.
- Amazon avoided Saltee Islands' conservation area in the cable route to minimize habitat disturbance.
- Amazon has provided over €125,000 to 15 local projects and plans further funding discussions for 2026.
- The jointing of the cable ends offshore will take 18-24 hours and be handled onboard the vessel.

**Companies:** Amazon
**Countries:** Ireland

[Read the full story on Independent.ie](https://www.independent.ie/regionals/wexford/wexford-district/amazon-submits-application-to-construct-underwater-fibre-optic-cable-off-coast-of-wexford/a2059147387.html)

---

Canonical: https://newsio.io/n/d60143ba-d349-4e21-97aa-ae654feaa8b2/the-cables-will-be-33mm-in-diameter-will-be-buried-to-an-average-depth-of-approx
Summarized by Newsio from Independent.ie. https://newsio.io/how-it-works
