# Supply of piped natural gas (PNG) should be ensured within 10 days for households already connected to the PNG line.

*semiconductor · news · 2026-04-09 · Free Press Journal*

## Key points

- Households with existing PNG lines must receive supply within 10 days or risk LPG discontinuation.
- Institutions like police, defence, and reformatory homes are prioritized for new PNG connections.
- District authorities will organize camps in colonies to promote and facilitate PNG adoption.
- Industrial units near PNG networks are being identified and required to switch to PNG supply.
- Marriage gardens and street vendors will have commercial gas cylinder supply capped at 70%.

**Countries:** India

[Read the full story on Free Press Journal](https://www.freepressjournal.in/bhopal/mp-news-10-day-png-supply-deadline-for-connected-households-says-acs-rashmi-arun-shami)

---

Canonical: https://newsio.io/n/c2c26525-8fcc-4865-838e-07ff744f8d1c/supply-of-piped-natural-gas-png-should-be-ensured-within-10-days-for-households
Summarized by Newsio from Free Press Journal. https://newsio.io/how-it-works
