genai / news / / Wccftech
Microsoft's Fairwater AI datacenter is going live ahead of schedule.
Microsoft's Fairwater AI datacenter is going live ahead of its previously announced schedule.
KEY POINTS
- Fairwater will utilize hundreds of thousands of NVIDIA Blackwell GB200 GPUs in a single cluster.
- The facility connects its GPUs with enough fiber optic cabling to circle the globe 4.5 times.
- Microsoft is pre-paying for energy and building a new 250MW solar plant to avoid raising local energy prices.
- The datacenter uses a closed-loop liquid cooling system that requires no additional water post-construction.
COMPANIES
Summarized by Newsio from Wccftech. How we summarize →