semiconductor / news / / Wccftech
Intel has officially announced that its 18AP and 14A nodes are seeing big customer engagements, with 14A already securing a win at Tesla.
Intel's 14A process node has secured a major foundry deal with Tesla for the TeraFab project.
KEY POINTS
- 14A process maturity, yield, and performance now surpass Intel's previous leading-edge 18A node.
- Intel's 0.5 PDK for 14A is available, with 0.9 PDK enabling customers to finalize fab plans soon.
- Intel expects more external design commitments on 14A and 18AP to emerge between 2026 and 2027.
- Elon Musk confirmed 14A is not yet in mass production but will mature alongside Tesla's TeraFab scaling.
COMPANIES
Summarized by Newsio from Wccftech. How we summarize →