# The Arizona production site generated a profit of NT$16.14 billion, or approximately USD 514 million, in 2025 during its first full year of mass production.

*semiconductor · news · 2026-05-12 · News18*

## Key points

- TSMC's Arizona facility generated a profit of USD 514 million in its first full year.
- Construction of TSMC's second Arizona fab is finished, with mass production set for late 2027.
- TSMC began building a third Arizona fab in early 2024, planning further long-term expansion.
- TSMC plans an additional USD 100 billion Arizona investment for three more fabs and R&D facilities.
- TSMC faces ongoing water, power, and labor shortages in Arizona, needing state and regulatory support.

**Companies:** Taiwan Semiconductor Manufacturing Co.
**Countries:** Taiwan, United States

[Read the full story on News18](https://www.news18.com/agency-feeds/tsmc-arizona-project-yields-profit-amid-water-and-labour-challenges-10086422.html)

---

Canonical: https://newsio.io/n/4d0ab6c9-bfae-41e5-a418-a0353fd03aa4/the-arizona-production-site-generated-a-profit-of-nt16-14-billion-or-approximate
Summarized by Newsio from News18. https://newsio.io/how-it-works
